Maybert Bridge at Canyon Creek Replacement

Owner directed changes and winter suspension extended the project completion date. All work was completed in the allotted contract time.


Job Number:

125

Owner:

Nevada County, CA

Owner Contact:

Greg Ziess

Owner Phone:

916-367-8059

Start Date:

7/16/2016

Completion Date:

12/9/2016

Contract Value:

Techn. Description :

Removal of an existing bridge and replacing it with an 80 foot long single-span manufactured structural steel bridge.



Techn. Work Description:

Final Amount:

Contract Number:

224017

Change Comments:

Award Date:

Performance Comments:

Owner directed changes and winter suspension extended the project completion date. All work was completed in the allotted contract time.


Project Manager:

Steve Moseman

Super Intendent:

Robert Mathews

Major Contractors:

Camblin Steel Service, Inc. – Reinforcing Steel
Frank Medina General Engineering, Inc. – Fence and Guardrail
Nitta Erosion Control – Hydroseeding