Pilgrim Creek ERFO

All work was completed within the allotted Contract Time.


Job Number:

127

Owner:

US Federal Highway Administration

Owner Contact:

Orrin Lee

Owner Phone:

720-289-8797

Start Date:

10/16/2016

Completion Date:

6/1/2017

Contract Value:

Techn. Description :

Culvert replacement with a cast-in-place slab bridge and storm damage repairs with concrete block mats



Techn. Work Description:

Final Amount:

Contract Number:

DTFH68-13-D-00007-0001

Change Comments:

Award Date:

Performance Comments:

All work was completed within the allotted Contract Time.


Project Manager:

Kevin Ramstrom

Super Intendent:

Scott Campbell

Major Contractors:

S.T. Rhoades Construction, Inc. – Paving
Schwager Davis, Inc. – Post Tensioning
Camblin Steel – Reinforcing Steel
Acme General Engineering, Inc. – Pile Driving