River restoration including erection and removal of a 140′ long temporary bridge, excavation, onsite transporation and placement of +/- 70,000 CY of material to construct new floodplains and other site improvements, and construction of an equalization structure including placement of +/- 7,000 tons of rip rap and +/- 2,000 tons of cobbles.