Repair of levee at 3 original and 2 added locations. 96,532 tons Rock Slope Protection, 71,000 Tons Rock Fill, 11,980 Tons Rock Bedding, 5,138 Tons Aggregate Base, 31,632 Tons Earth fill, 14,568 Tons Ag Soil. Simultaneous repairs at 3 locations. All locations required BMP/s to isolate and protect water resources.