Project Name & #
Owner
Location
Description
Start Date
Comp Date
Contract
State of California Department of Transportation
100 foot long, single span, precast/prestressed, concrete box girder bridge located on Hwy 3 in Fort Jones. Caltrans utilized the precast bridge to design to accelerate construction and complete the work within the tight weather and environmental windows.
June 2021
$4,164,676
County of Sonoma
159 foot long, 3-span, cast-in-place, prestressed, concrete slab bridge located in Sonoma County was constructed for increased hydraulic clearance for Mark West Creek, a tributary to the Russian River. As part of the environmental restrictions to protect spawning Coho Salmon, the falsework for this bridge used a multi bracket falsework support system which prevented the need for any falsework bearing supports in the channel.
July 2020
State of California Department of Transportation
383 foot long, 78 foot tall, 4-span, cast-in-place, reinforced concrete box girder bridge located on Hwy 36 in Trinity County. This new bridge was constructed as part of a highway realignment to provide a safer travel way for the public. The project also included over 60,000 CY of excavation and embankment, soldier pile wall support of excavation for foundation construction, and creek restoration work for fish passage.
May 2019
State of California Department of Transportation
110-foot long, precast/prestressed, concrete box girder bridge located on Hwy 44 near Old Station in Shasta County. This project utilized a contractor designed temporary bridge to maintain traffic through the corridor while the new bridge was being constructed, allowing construction to be completed in one season.
July 2019
$5,973,452
County of Toulumne
Hardin Flat Road over S. Fork Toulumne River
120 foot long clear-span, cast-in-place, concrete box-girder bridge located off Hwy 120 in Tuolumne County. In September 2020 the American Society of Civil Engineers awarded Hardin Flat Bridge one of the most Outstanding Bridge Projects of the year.
April 2017
$2,384,262
US Federal Highway Administration
Justin Henwood
720-963-3432
Eleven Pines Road, Blacksmith Road, El Dorado County
Storm damage repairs including: riprap, buttress, and geosynthetic reinforced fills.
In Progress
County of San Jouquin
Michael Chung
(209) 468-3586
Wildwood Road over Temple Creek in San Joaquin County
Bridge replacement project with precast concrete girder bridge
In Progress
County of Yuba, Community Development & Services Agency
Neil Retelsdorf
530-749-5420
New York Road, Yuba County
Bridge replacement project
In Progress
County of Placer
Desiree Belding
(530) 889-4256
Wise Road over Doty Creek, Placer County
Bridge replacement project



In Progress
Caltrans
Kassaye Seyoum
(707) 223-1213
Hwy 101 & 271 MendocinoCo. Near Cummings CA
Emergency roadway repairs including geosynthetic reinforced fills, riprap buttress, drainage, MBGR improvements and paving.



In Progress
Caltrans
Paul Lukazewicz (Golden State Bridge, Inc. – Prime Contractor)
(415) 720-6577
Hwy 96, Humboldt County
Earthwork subcontractor for an emergency slide repair with a soldier pile, timber lagging, and retaining wall
In Progress
Crescent City Harbor District
Lane Tavasci
707-464-6174
Crescent City Harbor – Crescent City, CA
Remove deteriorating piles from pier and replace with new.



10/16/2016
10/11/2016
124,650.00
US Federal Highway Administration
Orrin Lee
720-289-8797
Covelo, CA
Storm Damage Repairs Including Riprap, Buttress and Geosynthetic Reinforced Fills.
09/16/2016
In Progress
1,117,777
US Federal Highway Administration
Orrin Lee
720-289-8797
Pilgrim Creek, McCloud CA
Culvert replacement with a cast-in-place slab bridge and storm damage repairs with concrete block mats



10/16/2016
6/17/2018
Nevada County, CA
Greg Ziess
916-367-8059
Washington, CA
Removal of an existing bridge and replacing it with an 80 foot long single-span manufactured structural steel bridge.



7/16/2016
4/4/2017
California Department of Transporation
Paul Lukazewicz (Golden State Bridge, Inc. – Prime Contractor)
(415) 720-6577
PM 6.50, Hwy 197, Del Norte County
Replacement of an existing culvert with a precast girder bridge. We were subcontracted to perform site earthwork including construction of temporary hilfiker wall abutments for a temporary detour bridge, excavation and backfill for the new bridge abutments, clearwater diversion, removal of the existing culvert from under the new bridge structure, removal of detour, and final site grading.



6/16/2016
11/10/2016
$1,198,342.90
State of California Department of Transportation
John Orgera, Construction Supervisor
(916) 376-9896
Sycamore Island – Fresno, CA
River restoration including erection and removal of a 140′ long temporary bridge, excavation, onsite transporation and placement of +/- 70,000 CY of material to construct new floodplains and other site improvements, and construction of an equalization structure including placement of +/- 7,000 tons of rip rap and +/- 2,000 tons of cobbles.



7/16/2016