Project Name & #
Owner
Location
Description
Start Date
Comp Date
Contract
State of California Department of Transportation
Juris Mergups
707-464-4618
Multiple Bridges near Crescent City, CA
Seismic Retrofit Improvements to 4 Bridges
7/16/2016
In Progress
1,071,289
State of California Department of Transportation
Nicole (Nikki) Mallory, Resident Engineer
530-235-2593
Hwy 96 Emergency Repair, Siskiyou County near Seiad Valley, CA
This project repaired a slide on Hwy 96 along the Klamath River. Temporary shoring using a Hilfiker wall with spiral nails was installed to stabilize the remaining roadway. The unstable slide material was excavated and replaced by a rock slope protection buttress. A Hilfiker wall was constructed on the buttress to gain additional width.



1/16/2016
7/16/2016
1,749,139.26
State of California Department of Transportation
Danilo Patenia
510-224-6309
Hwy 128, Napa Country near Lake Berryessa
Embankment Repair using Liteweight Cellular Concrete Fill and Drainage Improvements
6/16/2015
8/16/2015
1,061,377
Plumas County Dept of Public Works
Mike Knight
916-368-9181
Hwy 36, 4 miles east of Chester, CA
Bailey Creek Bridge Replacement
8/15/2015
10/16/2015
1,954,545
State of California Department of Transportation
Jeff Johnson
530-623-6714
Hwy 49, Yuba County near Camptonville, CA
Roadway Embankment & Pavement Settlement Repair including Rip Rap, Grinding and Paving
6/15/2015
6/15/2015
426,777
US Bureau of Reclamation Walker River Paiute Tribe
Jason Foust
530-474-1013
Walker River near Schurz, NV
Walker River Stabilization including Dewatering, Removal of Siphon Pipe, Remvoal Concrete Weir, Stream Grading and Rip Rap
12/14/2014
3/15/2015
360,270.31
Shasta County Department of Public Works
John A. Crowe PE
530-225-5661
Lakeshore Drive Shasta Co.
Slide Repair with Rip Rap Buttress
10/14/2015
11/1/2014
91,925
City of Fortuna
Kevin Carter
(707) 725-1471
Holman Way, Fortuna, CA
Demolishion of an existing 60′ tall water tank and tower.



5/27/2014
6/6/2014
$71,280.84
District, Humboldt Waste Management Authority
Jesse Solorio Lawrence & Associates
(530) 275-4800
Cummings Road Landfill, Eureka, CA
Excavate, Transport, Dispose and Cap +/- 40,000 CY of Burn Ash Debris; Geogrid Fill, Impermeable Liner, Erosion Control.



6/10/2014
In Progress
$2,753,277.72
State of California Department of Transportation
Heidi Quintrell, Resident Engineer
(707) 825-4747
Humboldt County at Various Locations from 0.8 mile west of Pecwan Bridge to 1 mile east of Cappell Crk Bridge
Highway 169 road widening at multiple locations including construction of a timber lagging soldier pile retaining wall, a ground anchor/soil nail retaining wall with textured and stainined architectural concrete, multiple excavations and embankments, guard rail improvements, paving, and installation of a rock fall cable net drapery system.



4/15/2014
3/23/2016
4,634,090.26
US Federal Highway Administration
TBD
Northern California and Northern Nevada
Rapid Response Road Construction Repair Contract
TBD
TBD
Varies
District, Humboldt County Resource Conservation
David Carter GHD
(707) 267-2236, 718 3rd Street Eureka, CA 95501
Mad River Fish Hatchery, Blue Lake, CA
Mad River Hatchery Weir Removal and Fish Ladder Extension
9/16/2013
11/11/2013
$292,579.80
State of California Department of Transportation
Jeff Zimmerer, Resident Engineer
(707) 498-3207
Post Mile 0.4/.09, Hwy 299, Trinity County near Salyer, CA
Curve improvement project with three (3) retaining walls including a soldier pile timber lagging wall, a soil nail wall, and a mechanically stabilized earth wall. Project design features included intregally colored cast-in-place concrete with a stacked rock texture and concrete staining of the individual patterned rocks



4/15/2014
6/13/2016
$4,317,056.06
State of California Department of Transportation
Tim Crosby
(530) 320-6460
Hwy 89, Sierra Co., CA
Wildlife Crossing Including Placing Rip Rap, Wire Mesh Fence & Gates
8/1/2013
11/25/2013
$433,340.47
Sub, CalEx Engineering Co.
Wendell Beniga (CalEx Engineering – Prime Contractor)
(661) 254-1866
Highway 101 Emergency Repairs, Del Norte Co., CA
Retaining Wall Structural Excavation, CIP Reinforced Concrete Walers, Drainage. (Subcontractor)
5/28/2013
11/8/2013
$671,861.87
Sub, Site Work Solutions, Inc.
George Whitmire
(530) 222-2229
Redding, CA
IDIQ Road Maintenance Contract (Subcontractor)
6/24/2013
In Progress
934,593
State of California Department of Transportation
Anthony Granados
(530) 527-8417
Mill Creek Bridge, Hwy 36, Tehama County, CA
Repair Bridge Scour with Rip Rap. Place Polyester Concrete Overlay on Bridge Deck.
7/1/2013
12/3/2013
$740,309.86
County of Alameda
Steven Ellis
(925) 454-5000 Alameda Co Flood Control Zone 7
Livermore, CA
Slope Repair Project, Construction of MSE Geogrid Wall, Storm Drainage, Slope Armoring
9/4/2012
2/13/2013
1,499,999
State of California Department of Transportation
Karen Sanders
(707)498-4009
Highway 101 Emergency Repairs, Humboldt Co. CA
Storm Damage Repairs
1/1/2012
9/16/12
$1,132,900.00
Sub, Dutra Dredging Co.
Ray Waters
(415)450-0871
Crescent City, CA
Rip Rap (Subcontractor)
9/1/2011
12/1/2011
923,564